Case Study Sample 2
Site Description
3- Bedroom farmhouse, Cumbria
Requirements
A packaged sewage treatment plant to cater for waste
produced from 3-bedrooms
(maximum 6-persons:
P.E equivalent), one shower / bath, single
sink,
washing machine.
Installation date
Jan 2006
Product
BioDisc BA
Notes
The client approached Klargester to discuss the options for replacing a failing brick Septic Tank. Key criteria were to reduce frequency of tank-emptying visits and to use existing soakaway without the risk of blockage. Major concern was also to reduce pollution of surrounding streams and watercourses.